Introduction
Welshpool MR Show Oct 09
McHale's Metals - Gn15
French Tramway
7mm Narrow Gauge
Finnegan's Crossing TT9
Cheethams Yard G1n16.5
Redwood Lumber Co
Blackhawk House On30
Port Able 16mm/ft
Short Street 009 trams
009 Layout
Two Sisters Farm 1/32nd
Events
e-mail me


009 Layout

009layout.jpg

This is a terminus layout, constructed on a 4 foot by 2 foot board and includes the fiddle yard on the same board.

The board has been constructed of MDF on a 2"x1" softwood frame and the track has been laid.

It is now waiting for the track to be wired up, painted, surfaces cleaned and a selection of locomotives tested on it before the scenic work commences.

The white dotted line indicates where the backscene and scenics will be positioned.




Rhos Tramway 1.jpg

A bit more work has been undertaken (not as much as I'd had liked!)...
but you can now see where the scenery fits!
The vehicles and buildings are just placed on the layout to see what they look like at present.




RhosTramway2.jpg

Track ballasting, wiring and test running next, along with the addition of a large amount of 'greenery!